logo comp4

Sand Washing Tore

201211production was maintained at rates of approximately 140,000 bd during desanding and sand washing, and the project was completed with no harm to people or the environmentll of the sand was washed to below 1 oil on sand, in line with angolan operating requirements, with an average of 0oil on sand.